| Roofing systems :: SYSTEM 09
:: SYSTEM 09
 |
- Single-layer covering.
- Fastening by welding without insulation.
- Concrete base.
|
- Concrete base, grounded.
The base made with a slope min3%, max.20% (When repairing the old covering it is necessary to clean and level the irregularities of ground). In the places of defects weld few layers of membrane or use the filling mass and then ground the whole. - Base sheet membrane e.g.: IZOBIT V60S30, IZOBIT SUPER P-V 100 S35 SBS, IZOBIT SUPER P-PYE 180 S4 SBS (fastening by welding)
- Top covering membrane e.g.: IZOBIT SUPER W-PYE 250 S52 SBS (fastening by welding)
Purpose:
New roof covering or repair of the old
|