Our products Roofing systems Laying felts
  Contact About us
IZOBUD Sp. z o.o. TRANSPORT, SPEDITION
enter hier »
Roofing systems
System 01
System 02
System 03
System 04
System 05
System 06
System 07
System 08
System 09
System 10
Roofing systems :: SYSTEM 06
:: SYSTEM 06

  • Two-layer covering
  • Fixing by welding ventilated without insulation
  • Concrete base

  1. The concrete base, grounded. The base made with a slope of min. 3%, max.20% (when repairing the old covering it is necessary to clean and level the irregularities of ground) In the places of defects weld few layers of membrane or use the filling mass and then ground the whole.
  2. Perforated membrane – ventilation PP 50/700 laid loosely with tucks of 2-3 cm. Lay in the distance not less than 50cm from chimneys, attics, eaves and other existing elements on roofs.
  3. Base sheet membrane e.g.: IZOBIT V60S30, IZOBIT SUPER P-V 100 S35 SBS, IZOBIT SUPER P-PYE 180 S40 SBS (fastening by welding)
  4. Top covering membrane
    IZOBIT G200 S42 H, IZOBIT SUPER W-PYE 150 S47 SBS, IZOBIT SUPER W-PYE 250 S52 SBS (fastening by welding)
  5. Ventilation chimney (1 by about 40m²)when fastening by welding it should be put on perforated membrane
  6. Plastic building putty (between membrane and chimney outlet).

Purpose:
New roof covering or repair of the old

Our products Roofing systems Laying felts
  Contact About us
2005 - 2012 IZOBUD Sp. z o.o. | all rights reserved | made by: www.icts.pl