| Roofing systems :: SYSTEM 05
:: SYSTEM 05
 |
- Single-layer covering
- Fastening by welding ventilated without insulation
- Concrete base
|
- The concrete base, grounded.
The base made with a slope of min. 3%, max.20% (when repairing the old covering it is necessary to clean and level the irregularities of ground. In the places of defects weld few layers of membrane or use the filling mass and then ground the whole.) - Perforated membrane – ventilation PP 50/700 laid loosely with tucks of 2-3 cm. Lay in the distance not less than 50zm from chimneys, attics, eaves and other existing elements on roofs.
- Top covering paper IZOBIT SUPER W-PYE 250 S52 SBS fastening by welding or mechanically (only when repairing)with connectors, 3 to 9 pcs/m², depending on the roof area, without the need to lie perforated membrane.
- Ventilation chimney (1 by about 40m²)
- when fastening by welding it should be put on perforated membrane - whilst mechanical fastening put on ground - Plastic building putty (between membrane and chimney outlet).
- Mechanical connector (the type depending on the ground and thickness of the whole system).
Purpose:
New roof covering or repair of the old
|