| Roofing systems :: SYSTEM 01
:: SYSTEM 01
 |
- Single-layer covering
- Fastening by welding without thermo-insulation
- Concrete base
|
- Concrete grounded base.
The base made with slope min.3% max. 20% - when repairing the old covering it is necessary to clean and level the ground irregularities. In the place of defect weld few layers of membrane or apply filing mass and then weld the whole. - Top covering membrane IZOBIT SUPER W-PYE 250 S52 SBS
( fastening by welding)
Purpose:
New roof covering or repair of the old
|